Fun Facts

By the numbers

  • 92,000 square feet
  • 3 floors
  • 15 hospital beds
  • 24 clinic exam rooms
  • 5 emergency treatment bays
  • 53 toilets
  • 124 sinks
  • 377 doors

Did you know?

  • 400 tons – or 800,000 pounds – of structural steel were used to build the new medical center. That’s roughly the weight of 133 elephants.
  • 118,500 bricks – each 15.5 inches long – were used on the building. Laid end-to-end, that would be just under 29 miles long.
  • 1,200 gallons of paint were used throughout the building.
  • 3,860 cubic yards of concreted were used for the foundation and floor. That is enough concrete to pour a standard sidewalk 15 miles long.